【 Knowledge Sharing】Mosaic Laying Process Flow & Precautions

一、Mosaic Laying Process Flow

1. Preparation

Prepare materials: Choose special adhesive (e.g., alkali-resistant adhesive for glass mosaics) and matching grout based on mosaic material (glass, ceramic, stone, etc.); tools include a small notched trowel (tooth depth 3-5mm), level, small rubber mallet, masking tape, small grout trowel, and sponge. Check mosaics in advance: For mesh-backed mosaics, ensure the mesh is intact; layout according to the laying area size, avoiding overly small pieces at corners (minimum piece size ≥ 1/3 of a full piece is recommended). 


马赛克施工工具


2.Base Layer Treatment: 

Clean the base layer: Remove dust, oil stains, and hollow areas from walls/floors; fill cracks in the base layer with repair mortar if any; the flatness error of the base layer must be ≤ 2mm (mosaics have small pieces, requiring higher flatness), and level uneven areas with cement mortar; spray water to moisten walls before laying (for stone mosaics, an interface agent must be brushed on the base layer to improve adhesion). 


基面处理


3.Snap Line Positioning

Use a chalk line to snap horizontal and vertical lines, marking the laying reference lines (one control line every 1m is recommended); mark the mosaic laying direction (e.g., horizontal/vertical) on the base layer according to the layout drawing, and lay full-mesh mosaics first at door/window openings to ensure visual symmetry. 


标记
标记

4.Adhesive Application

Mix the adhesive: Add water and mix according to the instruction manual until it is smooth paste without particles, let it stand for 5-10 minutes, then mix again (to improve viscosity); use a small notched trowel to evenly apply the adhesive on the base layer along the reference line (thickness 3-5mm, trowel direction perpendicular to the mosaic laying direction to ensure uniform adhesive teeth), and apply no more than 1㎡ each time (to prevent the adhesive from solidifying too quickly). 


贴花砖
贴花砖

5. Mosaic Laying

Mesh-backed mosaics: Gently press the full-mesh mosaic on the adhesive, tap lightly along the mesh with a small rubber mallet (even force to avoid piece displacement), ensuring each mosaic piece adheres to the adhesive; check flatness with a level, error ≤ 1mm. Loose mosaics: Lay piece by piece according to the layout drawing, adjust small pieces with tweezers, and press lightly to fix after laying. 15-20 minutes after laying (when the adhesive is semi-dry), peel off the mesh (gently to avoid lifting mosaics); if any piece falls off, reattach it with adhesive immediately.


马赛克粘贴
马赛克粘贴

6. Gap Treatment

24 hours after laying (when the adhesive is fully cured), clean dust on the mosaic surface; use a small grout trowel to fill gaps with grout (mosaic gaps are narrow, so press repeatedly to ensure full filling and avoid hollowing); 10-15 minutes after grouting, wipe the surface with a damp sponge along the gap direction to remove residual grout (to prevent difficulty in cleaning after drying), taking care not to scrape the grout in the gaps. 



马赛克清洁
马赛克清洁

7. Curing & Protection

 Cure naturally for 5-7 days after grouting, avoiding stepping, getting wet, or collision during this period (mosaic pieces are easy to loosen due to external force); cover with a transparent protective film during curing to prevent dust pollution or direct sunlight from cracking the grout; avoid acidic detergents touching glass mosaics during curing (to prevent surface corrosion). 



泳池马赛克
×
泳池马赛克

二、Mosaic Laying Precautions


1.Before Laying

Material adaptation: Do not use ordinary cement mortar for glass mosaics (prone to alkali efflorescence and surface pollution); choose alkali-resistant special adhesive; stone mosaics need waterproof treatment in advance (to prevent discoloration from water absorption). - Uniform batches: Use mosaics from the same batch in the same area to avoid color difference caused by production batch differences; for mesh-backed mosaics, check the mesh material (non-woven mesh is easier to peel off than paper mesh).



展厅 (28)
展厅 (28)

2.During Laying

Adhesive validity: The mixed adhesive must be used within 1.5 hours (mosaic laying is slow, to avoid premature solidification of the adhesive); if the adhesive dries and clumps, do not add water to remix (discard and remix). - Mesh peeling timing: Peeling the mesh too early may cause mosaic displacement, while peeling too late may make the mesh stick to the adhesive (the best time is 15-20 minutes after laying, when the adhesive is not sticky to the touch). 



卡拉拉马赛克
卡拉拉马赛克


3.After Laying

Curing duration: Longer than ordinary tiles (at least 5 days), especially for glass and stone mosaics; early use may cause piece falling or grout cracking. - Cleaning method: Use neutral detergent + soft cloth for daily cleaning; do not scratch with steel wool or sharp tools (glass mosaic surfaces are easy to scratch, and stone mosaics are easy to be damaged); if the grout falls off locally, refill with the same color grout and cure for 2-3 days.



prev
【 Knowledge Sharing】How to Inspect Tiles Upon Delivery
【 Knowledge Sharing】Tile Laying Process Flow & Precautions
next
recommended for you
no data
Get in touch with us
A-diffusion's business initially started with ceramic tiles. In accordance with the diverse demands of customers, the product varieties have been continuously expanded to include mosaics, bathroom products, and other architectural decoration materials.
no data
Contact us
Contact person: A-diffusion
Cell / Whatsapp / Wechat:
+86-138 2774 9600
Address
P06-5# building, Huibo Plaza, nanzhuang town, Foshan.
Copyright © 2025 A-diffusion-www.a-diffusion.com | Sitemap Privacy Policy
Contact us
email
phone
wechat
whatsapp
Contact customer service
Contact us
email
phone
wechat
whatsapp
cancel
Customer service
detect